Fujian Xinsheng Steel Industry Co., Ltd.

steel bridge

steel bridge
Product Detailed

light weight
saving building material
rapid installation
easy maintenance,suitable for continuous beam
high fiexural

1. Finished  steel bridge ( our project overview)

2. We can design as your plan, and produce according your drawings.

3. The manufacture procedure including drilling, rust removing, shot blasting and so on.

4. Provide us  the drawing is inluding generally ichnolgraphy, solid drawing, and material type.

5. We are provide you a completely sets of service,  quotation, design, manufacture, transport, and

installation, also tech-guide, and after-sale serivce .

6.Don't hesitate, contact us.

 

 The box girder section bridge has many advantages:light weight,steel saving,rapid installation,easy maintenance,and high flexural and tensional rigidity,suitable for continuous benm,good bearing capacity,simple and nice appearance in harmony with the surrounding environment.During the period of the box girder construction,the west-east and north-south traffic will be greatly fluenced.

 

Design ParametersIf you need we design for you, pls supply us the following parameter together with detail size:
1)Live load on roof(KN/M2)
2)Wind speed(KM/H)
3)Snow load (KG/M2) if have
4)Earthquake load if have
5)Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure



Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.